Townhouses and villas in complex in the suburbs of Tivat

UID:
I-00545-VL
308,000€
Descriptions
  • House in Montenegro
  • house in Tivat
  • pool
  • see view
Details

Townhouses and villas in complex in the suburbs of Tivat.

There will be 30 houses on a private area of 23,000 m2. All houses with panoramic sea views!

Townhouses

The area of the townhouses is 126 m2. Each apartment has: living room-kitchen, 2 bedrooms, 2 bathrooms (one with bath), 2 terraces, parking space. Plot area 200 m2. Cost – from 308,000 euros

Villas

  • Two-storey single-family villa with an area of 176 m2. Living room-kitchen, 4 bedrooms, 3 bathrooms, 2 terraces, parking space. Price with a plot of 500 m2 from 495,000 €. Cost with a plot of 1,000 m2 from 700,000 €
  • Three-storey villa. The area of the villa is 220 m2. The area of the plot is from 1000 to 1200 m2. Individual layout of the first floor, second and third floors like CL villas, living room-kitchen, 3 or 4 bedrooms, 3 bathrooms (one with bath), 2 terraces, parking space. The cost of the villa is from 750,000 €

Included in cost:

  • Finishing of premises. Parquet/laminate/ceramic tile floors, walls and ceilings painted in any color of your choice. Full exterior finishing. Facade, roofing, gutters
  • All engineering systems. Electrical according to the project, sewerage, water, boilers in bathrooms, air conditioners in the living room and bedroom, heated floors in bathrooms and kitchen
  • Bathrooms. Tiles, plumbing
  • External arrangement. Terrace in front of the house, parking, path to the entrance to the house
  • The area in front of the house. Lawn, hedge

Additionally:

  • concreting additional paths
  • pool
  • sauna
  • gym
  • masonry of the house and grounds
  • placement and selection of furniture with a designer
  • woodwork inside/outside the house

Advantages

  • modern reinforced concrete structure
  • environmentally friendly and high-quality materials
  • warm energy efficient technologies
  • impact-resistant panoramic windows
  • layout to choose from

*Special purchase conditions (payment method and schedule, selection of the best items, etc.)

**The first houses (A1, C0, C1, C2, C9, C8, C7, C18, C17) were completed in 2023. 2nd stage of construction – spring 2024. 3rd final stage of construction – spring 2025.

  • ID: 115610
  • Views: 41
WhatsApp chat